May 10, 2019
Project: 5 pieces of power pipeline +1 piece of fuel gas pipeline
Length:150 meter
Goetec Wuxi: ø76mm hdd rod with NC23 thread
Date:2019-5-10
Location: Xuzhou, Jiangsu, China